| October 17th - bundles of ribbed
metal sheets arrive. These will form the base for the concrete floors. |
With amazing skill, the sheets
are lowered through the structure... |
...and stacked in the
appropriate parts of the building. |
|
 |
 |
 |
 |
| October 24th - the team prepare
to lay the concrete ground slab. |
Here's the wooden surround for
the concrete floor |
November 1st - Meanwhile the
stairs are added... |
...and the building is
surrounded in scaffolding to give the team access to the upper floors. |
 |
 |
 |
 |
| November 6th - the ribbed metal
sheets are laid to make the base for the floors. |
November 8th - more decking
sheets added - giving welcome shelter from the rain! |
The view from the Settlement
garden. |
November 11th - floor decking
complete as the scaffolding is shrouded in blue safety netting. |
 |
 |
 |
 |
| November 13th - the first
external wall, in the corner that will eventually be the building's main
entrance. |
November 20th - the full
structure. The stud work that will form the basis of the external
walls is visible on the left. |
November 20th - work goes on on
the lift shaft, and the internal walls on the lower ground floor. |
November 27th - a large pipe
brings concrete from ground level to the top floor, where it forms the
floor itself. |
 |
 |
 |
|
| November 26th - not much outward
sign of progress, but lots going on inside! |
December 5th - the main entrance
takes shape... |
,,,and the concrete floors are
complete. |
|