Building Watch   

Windows, wiring and white walls - April, 2003

The ceiling is fitted in the entrance area - April 2nd

Click on pictures to see full size version (in a separate window). 

Network cabling The playcentre area Door to playcentre garden A training room
Like grey spaghetti, these are the network cables that will connect the new computers. The playcentre area - looks a mess now, but wait till the kids get in there! The doors between the playcentre and the garden. One of the training rooms, after its first coat of white emulsion.  (The colour scheme will be white throughout, with plum accents.)
The roof terrace The roof terrace Barton Hill Green from the roof Thomas contemplates the view
The roof terrace, complete with paving slabs. The view of the newly refurbished old block from the roof. Thomas contemplates the view.
A window Entrance area Adding the ceiling Exterior view, April 8th
Many windows now have glass in. Steel uprights are added to support the glass walls of the entrance area. And the ceiling is added to the entrance. April 8th - the exterior.

Click on pictures to see full size version (in a separate window). 

 

The building project is being funded by Community at Heart.

 

Community at Heart logo

Architect's drawing of building from Settlement garden

Architect's drawing of side elevation